Covenant Christian School Block E & F
Value $1,200,000
Date 2012 - 2014
Following numerous successful projects in the primary school, the next stage in MCA’s masterplan developed with Covenant Christian School was provision of additional High school teaching and staff spaces.
![Covenant Christian School Block E](https://static.wixstatic.com/media/36edd0_6004f3afb74049c49c4f4dd25985f1eb~mv2.jpg/v1/fill/w_135,h_90,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/36edd0_6004f3afb74049c49c4f4dd25985f1eb~mv2.jpg)
![Covenant Christian School Block E](https://static.wixstatic.com/media/36edd0_7c2d576a708744ae8373ae7b9b4db0db~mv2.jpg/v1/fill/w_135,h_90,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/36edd0_7c2d576a708744ae8373ae7b9b4db0db~mv2.jpg)
![Covenant Christian School Block E](https://static.wixstatic.com/media/36edd0_4a051a4e714743e6a37a71b4c1295e00~mv2.jpg/v1/fill/w_135,h_90,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/36edd0_4a051a4e714743e6a37a71b4c1295e00~mv2.jpg)
![Covenant Christian School Block E](https://static.wixstatic.com/media/36edd0_6004f3afb74049c49c4f4dd25985f1eb~mv2.jpg/v1/fill/w_135,h_90,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/36edd0_6004f3afb74049c49c4f4dd25985f1eb~mv2.jpg)
The project added a first floor to each of the existing single storey E and F blocks. The existing classrooms in Block E were renovated whilst 4 additional flexible GLAs were added to the first floor. These GLAs could be opened up to one large open plan Exam Centre for up to 200 students.
A new staff room for 38 staff was added to Block F, whilst new circulation provided staff and students a new direct access pathway from the school entry to the Exam Centre and Staff Room.
Substantial redevelopment of external courtyard provided better integration with previous stages and large recreational space.